The objective of this project is to secure a consistent raw water supply for the Garraf Third River Water Intake Facilities. This will be accomplished through the construction of a comprehensive, integrated pumping system and supporting infrastructure.
Current Status:
-
-
- Operation Phase
Project Details:
-
- Scope: Provision of water supply from the third river intake area to client facilities, with a production capacity ranging from 200 to 400 Kbwpd (thousand barrels of water per day).
- Equipment: Procurement of water floating pumps and all necessary mechanical and electrical equipment required for the systems.
-
Project Duration:
-
-
- Construction Phase: 4 months
- Operations Phase: 5 years
-