RAW WATER SUPPLY ASSURANCE – Service Contract with IGC

Project Information

The objective of this project is to secure a consistent raw water supply for the Garraf Third River Water Intake Facilities. This will be accomplished through the construction of a comprehensive, integrated pumping system and supporting infrastructure.

 

Current Status:

      • Operation Phase

    Project Details:

      • Scope: Provision of water supply from the third river intake area to client facilities, with a production capacity ranging from 200 to 400 Kbwpd (thousand barrels of water per day).
      • Equipment: Procurement of water floating pumps and all necessary mechanical and electrical equipment required for the systems.

Project Duration:

      • Construction Phase: 4 months
      • Operations Phase: 5 years